Discuss your packaging line
Tell us what you are packaging and what you want the line to achieve. A short description is enough to start—we will help you define the detail.

Tell us what you need to package
A short description is enough to start. We can ask for samples, drawings and detailed production information after we have reviewed your enquiry.
Details that improve the first response
Exact information is not always available at the start, but known ranges and physical samples are more useful than generic descriptions.
Product
Viscosity, density, particulates, foam, temperature, hazards, cleanability and product supply.
Pack
Container, closure, seal, label, case and pallet formats, including dimensions and samples.
Production
Good output, shifts, batch sizes, changeovers, quality checks, footprint, utilities and timing.
Contact and enquiry questions
What should I include with my enquiry?
Send the product, pack range, closures, labels, target good output, batch pattern, layout and any existing equipment. Photographs, samples and drawings can follow by agreement.
Can I call before the full specification is ready?
Yes. Call 01494 623015 to discuss the early requirement and the information needed for a useful next step.
Where is the company based?
Lancing Ltd is based at Unit 5A Jefferson Way, Thame, Oxfordshire OX9 3SZ.
Send the production sequence with the format list
Describe a representative working day, including the order in which products and packs are made. Add the average run length, expected format changes and the point that currently limits production. This helps the first discussion connect equipment selection with the way the line will actually be used.
For each intended format, keep the product, container, closure and label together in one record. State whether it is a launch requirement, an occasional exception or a future possibility. If existing equipment must remain, identify it and explain any known limitation or unresolved interface.
- Project objective
- Rank the main priorities, such as capacity, pack consistency, handling or a new product. Explain where a compromise would be unacceptable.
- Readiness
- Identify which samples, drawings and layout information are available now and which decisions remain open. Use provisional values clearly rather than inventing precision.
Can I request advice before knowing the full line layout?
Yes. Start with the production requirement and available site information so the next survey, sample or interface question can be identified.